LATEST MILESTONESAs we move through 2025, construction of Ardgowan Distillery is now complete – and what a journey it’s been. Our mash tun is installed, thousands of metres of pipework and cabling are in place, and the final touches have been made to the site. With commissioning underway, the distillery is springing to life. Stay connected by exploring our project archive, where you can look back at the build and share in the story that brought Ardgowan to life.Follow our Distillery Journey Here Distillery from above Drone Shot Peak of the roof Distillery from roadside Roof closeup Roof pattern Pipework Still getting lowered into position Still lifted into distillery Stills getting piped into distillery Looking West Installing the grist case Grist case and frame Distillery Roof Complete Here comes the mash tun Mash tun in place Washback ingress to the building Installing the washbacks Washbacks Spirit receiver tank delivered Spirit tank in place Potale tank installation All arrows point to ardgowan Ardgowan Near Completion DJI_20250318150958_0004_D Stills polished The perfect roof Ardgowan at Night